Year:
Client:
Project Title:
Kilborn Project Reference:
Duration:
General Over View:

2016
C Spencer Limited
Doncaster Depot
1537
Ongoing
GRIP Stage 4-5

Following on from GRIP 3, the production of signalling design activities and deliverables required to complete GRIP Stage 4, Outline Design, associated with the proposed Hitachi Train Care Depot at Doncaster Carr. This included signal sighting as well as all conventional signalling design deliverables.