DIRFT III – GRIP 3-4

Following on from the feasibility study at Stage 1 (GRIP 2), Kilborn Consulting are developing the signalling design, both within the railfreight terminal and at the boundary with Network Rail, to AiP stage.

Contact Us

Get in touch with a member of our team…