Norwich Crown Point

  • Year:

    Commencement: February 2017

  • Client:

    PBH Rail

  • Project Title:

    Norwich Crown Point

  • Scheme Sponsor:

    Greater Anglia Trains

  • Duration:

    Ongoing

  • General Over View

    GRIP Stage 3-7

Background & Scope

As part of the Greater Anglia franchise agreement, Norwich Crown Point Depot, along with Wensum Sidings, are required to undergo substantial enhancement works in order to facilitate the stabling and maintenance of Greater Anglia’s fleet of new Stadler and Bombardier trains.

Kilborn Work & Outputs

Kilborn Consulting have been engaged by PBH Rail to carry out Signalling Design at GRIP 3 to achieve Approval in Principle. This included: carrying out correlation surveys and producing survey reports; production of a Signalling Scheme Plan and associated drawings; Operational Requirements Specification; Outline Project Specification; and Signal Sighting.

Further deliverables include Telecoms and Earthing & Bonding Design from GRIP Stages 3 – 5.

Contact Us