
DIRFT III – GRIP 3-4
Following on from the feasibility study at Stage 1 (GRIP 2), Kilborn Consulting are developing the signalling design, both within the railfreight terminal and at the boundary with Network Rail, to AiP stage.
Contact Us
Get in touch with a member of our team…
Company
Kilborn Consulting Limited
6th Floor
South Suite
12 Sheep Street
Wellingborough
Northamptonshire
NN8 1BL


