Prologis
DIRFT III – Stage 2
1553
Ongoing
GRIP 3-4
Following on from the feasibility study at Stage 1 (GRIP 2), Kilborn are developing the signalling design, both within the railfreight terminal and at the boundary with Network Rail, to AiP stage.